About the project

Geotechnical and Species Protection Support for a New Radio Mast in Aichwald-Aichelberg

For the proposed construction of a radio mast in Aichwald-Aichelberg, M&S Umweltprojekt provided geotechnical and species protection support. Ground conditions were investigated first, with borehole logs and a geotechnical report providing a sound basis for foundation design. This was complemented by a habitat suitability assessment, an assessment under species protection legislation and documentation of relevant species within the project area. Based on these findings, a landscape conservation plan was prepared, setting out measures to avoid, minimise and compensate for potential impacts on nature and the landscape. This enabled technical and ecological requirements to be incorporated together at an early stage of project planning.

Challenge

Planning the radio mast site required coordination of different technical and environmental requirements. Alongside a reliable assessment of ground conditions, potential impacts on species, habitats and the landscape had to be considered. Existing utilities within the construction area and applicable nature conservation and species protection requirements also had to be identified during the planning phase.

Our services

Our services included the geotechnical ground investigation, preparation and evaluation of borehole logs and site plans, and consideration of existing utilities through enquiries for utility records. Our species protection services included a habitat suitability assessment and an assessment under species protection legislation, surveying and documenting relevant species within the survey area, and preparing a landscape conservation plan (LBP) with measures to avoid, minimise and compensate for impacts on nature and the landscape.

Result & Added Value

The combined geotechnical and species protection assessments provided the client with a sound basis for technical design and ecologically sound development of the radio mast site. The ground investigation supports safe foundation design, while the habitat suitability assessment, species protection assessment and landscape conservation plan help identify ecological conflicts early and incorporate appropriate measures into the design. Technical and nature conservation risks were therefore systematically considered before construction.

Client

Cteam Consulting & Anlagenbau GmbH

Location

Aichwald-Aichelberg, Baden-Württemberg

Project period

2024–2025