About the project
Ground Investigation for the Remodelling of Stadthalle Zeulenroda
As part of the remodelling of Stadthalle Zeulenroda, M&S Umweltprojekt carried out a geotechnical ground investigation to establish the soil conditions and sequence of strata. Five small-diameter percussion boreholes, with diameters of 60/50 mm, were drilled to approximately 6 metres below ground level. The investigation identified and assessed fill, natural soil layers and their geotechnical properties. The findings were documented and provided for subsequent structural analysis and design.
Challenge
Further planning required a clear understanding of the ground beneath the existing paved and built-up areas. The investigation revealed a variable sequence of asphalt, pavement base layers, fill and natural soils with differing consistencies and properties. A key task was therefore to distinguish reliably between man-made fill and load-bearing natural strata.
Our services
Our services included preparation and notification of the investigation works, site setup, and drilling five small-diameter percussion boreholes to approximately 6 metres depth. We also logged and documented the soil profiles, assessed the sequence of strata and prepared geotechnical reports to support further planning.
Result & Added Value
The ground investigation provided the client with a sound basis for the structural analysis and design of the remodelling works. Detailed identification of fill and natural soil layers enables potential bearing capacity and settlement risks to be considered early and the design to be adapted to the actual ground conditions.
Client
Stadtverwaltung Zeulenroda, Bauamt
Location
Stadthalle Zeulenroda, Zeulenroda-Triebes
Project period
November 2025 – Januar 2026